DOWNLOAD DATA

Assets

Installed capacity of operated generation assets

AGL's installed capacity of black coal generation assets and gas fired generation assets decreased in FY23 due to the closure of the three remaining units at Liddell Power Station and Torrens Island Power Station A station units.

Notes

  • This breakdown includes only those generation facilities where AGL held operational control as at 30 June in the corresponding financial year.

  • FY23 installed capacity is the AEMO registered capacity, also taking into account the three 25 MW upgrades to Bayswater Power Station Units 4, 2 and 3 in FY20, FY22 and FY23 respectively. Slight differences from pre-FY21 data are caused by a change in methodology; previously installed capacity was listed as the lower of AEMO registered capacity and AEMO maximum capacity.

  • Historical data is available in the download file.